Mueller 6x9 D.I.Y. Greenhouse User Manual

Page 4

Advertising
background image

Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions

4

NoTe: Leading and trailing edge of

channels are overbent for a tight

fit. Spread apart as needed to

nest the purlin into the channel.

Base LaYouT (Bc-1 aND Bp-1)

Leveling and proper blocking is

critical for the base layout.

Bc-1

(Base channel)

Bc-1

(Base channel)

Bp-1

(Base purlin)

Bp-1

(Base purlin)

sTep 1

Insert BP-1 into BC-1

Triangles are for

door centering

sTep 2

Add MKB-1 (Galvanized MKB-2)

to top of BP-1 into BC-1

sTep 3

Advertising