Base layout (bc-1 and bp-1) – Mueller 12x15 D.I.Y. Greenhouse User Manual

Page 4

Advertising
background image

Mueller, Inc. 12x15 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video

4

NOTE: Leading and trailing edge of

channels are overbent for a tight

fit. Spread apart as needed to

nest the purlin into the channel.

BASE LAYOUT (BC-1 AND BP-1)

Leveling and proper blocking is

critical for the base layout.

BC-1

(Base Channel)

BC-1

(Base Channel)

BP-1

(Base Purlin)

BP-1

(Base Purlin)

STEP 1

Insert BP-1 into BC-1

Triangles are for

door centering

STEP 2

Add MKB-1 (Galvanized MKB-2)

to top of BP-1 into BC-1

STEP 3

Advertising