Step 7: non-tension end – Mueller Roll-Up Door L250 User Manual

Page 8

Advertising
background image

8

877-2-MUeLLeR

step 7: non-tension enD

B

The opening edge of guides should be inset a very small amount (about 1/8 inch) from the door jamb opening

on each side to minimize the potential of hitting the guides when entering through the door opening. Both
guides must be plumb and level with each other. NOTE: If jambs are installed correctly, the outside to outside
measurement of guides should be approximately 1 inch wider than the curtain width.

C

Once both guides have been correctly positioned, attach them to the jambs using the appropriate fastener at

each hole location.

step 8: attaCHing gUiDes anD MoUnting

BRaCKets to steeL JaMB

a

Mounting brackets and guides must be attached using fasteners provided.

iteM

JaMB

fasteneRs

DRiLL siZe

pRoViDeD fasteneRs

MOUNTINg

Steel

1/4” x 3/4” Carriage Bolt & Wing Nut

None

Provided

BRACKETS Concrete/Filled Block

1/4” x 1 3/4” Powers wedge-Bolt

Powers 01316

Not Provided

wood

3/8” - 7x3” lag Screw

OPT

Not Provided

Steel

1/4” - 14x1 - 1/4” TEK Screw

None

Provided

gUIDES

Concrete/Filled Block

1/4” x 1 3/4” Powers wedge-Bolt

Powers 01314

Not Provided

wood

1/4” - 10x1” lag Screw

OPT

Not Provided

Advertising
This manual is related to the following products: