Service, Torque chart, Replacing shifter cable assembly – MBW GPR77 User Manual

Page 12: Gas engine removal, Diesel engine removal, Ervice, Torque chart replacing shifter cable assembly

Advertising
background image

- 9 -

S

ERVICE

Assembly and disassembly should be performed by a
service technician who has been factory trained on MBW
equipment. The unit should be clean and free of debris.
Pressure washing before disassembly is recommended.

• Prior to assembly, wash all parts in a suitable cleaner or

solvent.

• Check moving parts for wear and failure. Refer to the

Replacement section in this manual for tolerance and
replacement cycles.

• All shafts and housings should be oiled prior to pressing

bearings. Also, ensure that the bearings are pressed
square and are seated properly.

• All bearings should be replaced when rebuilding any

exciter or gearbox.

• All gaskets and seals should be replaced after any

disassembly.

Torque Chart

Replacing Shifter Cable Assembly

Refer to Figure 1 Shifter Cable, page 7.

1.

Unbolt and remove the ball joint (item #5).

2.

Remove the jam nut (item #7), dust seal (item #3),
hex nuts (item #1) and washers (item #2).

3.

Slide the shifter cable out of the angle bracket (item
#4).

4.

Unbolt the shifter assembly (item #8) from the handle
and remove from the compactor.

5.

Install the new shifter assembly.

6.

Remove all necessary parts from the cable end and
slide it through the engine deck and angle bracket
(item #4).

7.

Install the washer (item #2), hex nuts (item #1), dust
seal (item #3), jam nut (item #7) and ball joint (item
#5) onto the cable.

8.

Bolt the ball joint (item #5) to the actuator arm (item
#6).

9.

Before tightening the two hex nuts (item #1) to the
angle bracket, adjust the cable (See Checking the
Shifter Cable, page 7)
.

Gas Engine Removal

Refer to Honda Main Assembly, page 22.

1.

Let the machine cool and clean all visible debris from
the machine before disassembly.

2.

Remove the (4) 3/8” flanged capscrews securing the
rollcage to the engine deck and remove the rollcage.

3.

If equipped with throttle cable, remove the air cleaner
cover and air filter.

4.

Remove throttle cable from engine. Be careful not to
loose throttle cable clamp.

5.

Remove the (4) 1/4” hex head capscrews securing
the beltguard to the side plate on the engine deck and
remove the beltguard and belt.

6.

Now is a good time to inspect and consider replacing
the v-belt.

7.

Remove the (4) hex head capscrews securing the
engine to the engine deck and remove the engine.

Diesel Engine Removal

Refer to Diesel Main Assembly, page 24.

1.

Let the machine cool and clean all visible debris from
the machine before disassembly.

SIZE

GRADE 2

GRADE 5

GRADE 8

1/4-20

49 in

lbs

76 in

lbs

9 ft

lbs

1/4-28

56 in

lbs

87 in

lbs

10 ft

lbs

5/16-18

8 ft

lbs

13 ft

lbs

18 ft

lbs

5/16-24

9 ft

lbs

14 ft

lbs

20 ft

lbs

3/8-16

15 ft

lbs

23 ft

lbs

33 ft

lbs

3/8-24

17 ft

lbs

26 ft

lbs

37 ft

lbs

7/16-14

24 ft

lbs

37 ft

lbs

52 ft

lbs

7/16-20

27 ft

lbs

41 ft

lbs

58 ft

lbs

1/2-13

37 ft

lbs

57 ft

lbs

80 ft

lbs

1/2-20

41 ft

lbs

64 ft

lbs

90 ft

lbs

9/16-12

53 ft

lbs

82 ft

lbs

115 ft

lbs

5/8-11

73 ft

lbs

112 ft

lbs

159 ft

lbs

5/8-18

83 ft

lbs

112 ft

lbs

180 ft

lbs

3/4-16

144 ft

lbs

200 ft

lbs

315 ft

lbs

1-8

188 ft

lbs

483 ft

lbs

682 ft

lbs

1-14

210 ft

lbs

541 ft

lbs

764 ft

lbs

1-1/2-6

652 ft

lbs

1462 ft

lbs

2371 ft

lbs

M 6

3 ft

lbs

4 ft

lbs

7 ft

lbs

M 8

6 ft

lbs

10 ft

lbs

18 ft

lbs

M 10

10 ft

lbs

20 ft

lbs

30 ft

lbs

CONVERSIONS

in

lbs x 0.083 = ft

lbs

ft

lbs x 12 = in

lbs

ft

lbs x 0.1383 = kg

m

ft

lbs x 1.3558 = N

m

Advertising
This manual is related to the following products: