MBW UV-10K User Manual

Page 9

Advertising
background image

- 6 -

2.

Remove the 6 nuts (#13) and bolts (#12) which
secure the mounting bracket to the vibration head
assembly and seperate the two with a suitable lifting
device.

3.

Remove old primary shock mounts (#1) by pressing
them out. A small hydraulic bottle jack or porta power
works best.

4.

After removing old mount, lubricate the new shock
mount and inner cylindrical surface of UV frame prior
to assembly. Be sure to apply enough lubricant to
completely cover both surfaces.

Note: Lubricate with a soap or rubber lubricant. Do not

use grease or oil as it will deteriorate the rubber.

5.

Assemble components of tool, shock mount, and UV
frame as shown in Figure 1.

6.

Tighten nut until the shockmount is fully seated in the
frame.

7.

Remove secondary and third compression mounts (#
5) by removing the clamping strips (# 3) on each side.
It may be necasary to insert a screwdriver between
the compression mount and the weldment (# 4) to
start removing the rubber.

8.

Clamp new secondary and third mounts into place.
Mounts should be as tight as possible.

9.

Reinstall mounting bracket. To avoid noise during
operation, make sure the bottom of the third mounts
are rotated away from the mounting bracket as you
tighten the bolts as shown in figure 2.

5$',867+,66,'(

5(&(667+,66,'(

FIGURE 1

GAP

FIGURE 2