Service, Torque chart, Service tools – MBW SP160 User Manual

Page 9: Handle disassembly, Handle assembly, Ervice, Torque chart service tools handle disassembly

Advertising
background image

- 6 -

S

ERVICE

Assembly and disassembly should be performed by a
service technician who has been factory trained on MBW
equipment. The unit should be clean and free of debris.
Pressure washing before disassembly is recommended.

• Prior to assembly, wash all parts in a suitable cleaner or

solvent.

• Check moving parts for wear and failure. Refer to the

Replacement section in this manual for tolerance and
replacement cycles.

• All shafts and housings should be oiled prior to pressing

bearings. Also, ensure that the bearings are pressed
square and are seated properly.

• All bearings should be replaced when rebuilding any

exciter or gearbox.

• All gaskets and seals should be replaced after any

disassembly.

Torque Chart

Service Tools

Handle Disassembly

Refer to Handle Assembly, page 12.

1.

Remove three screws (#18) securing handle and
remove, taking care to not lose spring (#10).

2.

Remove two screws (#15) holding bottom cover (#5)
and remove cover.

3.

Using a wrench across flats on valve spool (#4),
loosen and remove screw securing trigger (#8).

4.

Use a pick or small screwdriver, remove shaft wiper
(#2).

5.

Remove snap ring (#15).

6.

Using a wrench across the flats on valve spool (# 4),
remove screw securing lower spool (#7).

7.

Pull spool (#4) our the top of the body. Guide (#6) will
come out with spool.

8.

Push lower valve spool (#7) out the bottom of the
valve body (#9).

9.

Insert a long standard bladed screwdriver through the
inlet of the valve body to unscrew the gage (#11).

Handle Assembly

Refer to Handle Assembly, page 12.

Note: All o-rings and seals should be replaced after any

disassembly.

1.

Thread gage (#11) into body (#9) using a long
standard blade screwdriver and thread sealing
compound.

2.

Place o-rings (#12, 14) into grooves on valve spool
(#4). Coat o-rings with grease and insert spool (#4)
into body (#9).

3.

Place o-ring (#14) into groove on lower valve spool
(#7), coat o-ring with grease, and insert into bottom of
body. Secure to valve spool (#14) with screw (#17).
Use wrench across flats on valve spool to tighten
screw.

4.

Place o-ring in groove on upper guide (#6), coat with
grease, and insert into main body over the valve
spool.

SIZE

GRADE 2

GRADE 5

GRADE 8

1/4-20

49 in

lbs

76 in

lbs

9 ft

lbs

1/4-28

56 in

lbs

87 in

lbs

10 ft

lbs

5/16-18

8 ft

lbs

13 ft

lbs

18 ft

lbs

5/16-24

9 ft

lbs

14 ft

lbs

20 ft

lbs

3/8-16

15 ft

lbs

23 ft

lbs

33 ft

lbs

3/8-24

17 ft

lbs

26 ft

lbs

37 ft

lbs

7/16-14

24 ft

lbs

37 ft

lbs

52 ft

lbs

7/16-20

27 ft

lbs

41 ft

lbs

58 ft

lbs

1/2-13

37 ft

lbs

57 ft

lbs

80 ft

lbs

1/2-20

41 ft

lbs

64 ft

lbs

90 ft

lbs

9/16-12

53 ft

lbs

82 ft

lbs

115 ft

lbs

5/8-11

73 ft

lbs

112 ft

lbs

159 ft

lbs

5/8-18

83 ft

lbs

112 ft

lbs

180 ft

lbs

3/4-16

144 ft

lbs

200 ft

lbs

315 ft

lbs

1-8

188 ft

lbs

483 ft

lbs

682 ft

lbs

1-14

210 ft

lbs

541 ft

lbs

764 ft

lbs

1-1/2-6

652 ft

lbs

1462 ft

lbs

2371 ft

lbs

M 6

3 ft

lbs

4 ft

lbs

7 ft

lbs

M 8

6 ft

lbs

10 ft

lbs

18 ft

lbs

M 10

10 ft

lbs

20 ft

lbs

30 ft

lbs

CONVERSIONS

in

lbs x 0.083 = ft

lbs

ft

lbs x 12 = in

lbs

ft

lbs x 0.1383 = kg

m

ft

lbs x 1.3558 = N

m

Part No.

Description

20563

VALVE GREASE, SILICONE,.21 oz

20565

REBUILD KIT, SOIL PICK

Advertising
This manual is related to the following products: