Mountain Off Road JRB800 User Manual

Page 3

Advertising
background image

PAGE 3 of 6


7– Install jam nut onto rod end and thread rod ends together. Insert into brackets
and install 3/8” nyloc nuts. Raise or lower swinger bracket until rod is level and
tighten bolts (see figure 9).

8– Open and shut swinger and adjust rubber bumpers and rod ends by screwing
them in or out to make swinger close tightly (see figure 10). You will need to trim
the OEM rubber tire bumpers that were removed earlier. Trim them off only enough
to allow the tire carrier to contact them and preload against them when latched
(see figure 6).

9- Install brake light grommet and press brake light into grommet (see figures 11
&11A). Wire pigtail into OEM brake light wiring harness. Make sure to leave
enough slack for a full range of motion of the swinger.

10– You will need to press the wheel studs into the tire carrier, make sure to do this
for the correct wheel pattern (5 on 5” OEM or 5 on 5 1/2” ) (Figure 12 & 12A)

11– When installing the spare tire you will want to slide the base so that when the
tire is tight it is pre loaded against the tube. ( Figure 13)

12– Install the M.O.R.E. logo plate using supplied screws into drilled and tapped
holes on carrier, ( Figure 14 ).

13– The locking pin should be lubricated ( anti-seize) periodically.

14– Install tire and jack and verify smooth operation. Your done - go Jeepin!!

Advertising