sPOD JK Instructions 2007 2008 User Manual

Page 3

Advertising
background image

s

POD Installation Instructions

2007 - 2008 Jeep JK Wranglers

www.4x4s-POD.com

3

Use these 8mm screws to

mount Source bracket.

10 mm socket

12 mm socket

Auto Reset

Circuit Breaker

After installation

!!!Must start engine to activate system!!!

• Next attach the Source mounting bracket to the ECU unit located toward the front of the Jeep. And use the

2 existing 8mm mounting screws shown below.














• Snugly route power leads along firewall over to battery using supplied cable ties to secure..







• Connect

Positive

& Ground wire to battery terminals. Use supplied cable ties to secure all cables.











1. Attach your accessories here.
SWx Is the

Positive

and GND is the negative terminals.

2. Negative battery terminal.
3. Positive battery terminal.
4. Switch panel harness input.
5. Switch panel fuse.
6. Low voltage detection circuit.
7. Low voltage detection circuit fuse. Remove this fuse to
disable LVCO

If the LVCO detects a low voltage (10.6VDC) and
shuts the sPOD down, turn off all switches on sPOD
and start the vehicle to enable the sPOD again.

8. Accessory fuses. Any fuse can go here up to 30 AMPs. (6 pl.)
9. Relays that are removable.

Always keep your engine running

whenever possible when powering

electrical accessories


2

3

9

1

7

4

6

8

5

Advertising