sPOD TJ 2003-2006 Instructions over battery User Manual

Page 2

Advertising
background image

s

POD Installation Instructions

2003 – 2006 Wrangler

www.4x4s-POD.com

2

Send wire harness and

terminals down through here.

• Now you are ready to attach the entire assembly to the windshield using the ¼-20 Phillips head screws and

lock washers. Tighten all 4 screws (

careful not to over tighten

) while watching the alignment of the unit

against the windshield.

• Guide wire harness through right side of the sPOD header unit. Keep the harness as close to the

windshield rubber as possible. If you purchased the air gauge kit, then place the air line under the plastic
pieces and lead it all the way down the windshield pillar and down through the dash on drivers side.

• Remove glove box and feed wire harness down behind glove box and out of the way for now.
• Now drill a 1” dia. hole where shown from inside of the Jeep below the glove box area.












• Install supplied grommet and feed connectors through the firewall into the engine compartment.
• Re-install the battery.
• Next remove the 4 counter sunk screws from the plastic to the bracket and slide the assembly off the

bracket before installing the Source mounting plate.

• Loosen the 2 #10 screws using a 5/16” socket located on ECU just above the battery.















Drill 1 in. diameter hole here on

passenger side under glove box area.

Grommet

Pull carpet back

Use the 2 supplied #10 x 2”
long Philips head sheet
metal screws with washers
to attach Source mounting
plate to the ECU

5/16” #10 sheet metal screws

Counter sunk

screws

Re-install the Source back on to the plate.

Do not over tighten

4 counter sunk screws!

Advertising