Smittybilt N0482QC Nerf-Step User Manual

Installation instructions

Advertising
background image

WWW.SMITTYBILT.COM

For Technical Support/Warranty Information please call 310-762-9944

Smittybilt, 1600 Walnut Parkway, Compton, CA 90220

Installation Instructions

Nerf-Step (Part # N0482CC, N0482QC)


04-09 Nissan Titan Crew Cab 4-Door Short Bed




NOTE: Carefully read entire instructions thoroughly before attempting to install this part.

It is recommended to have some additional help while installing these bars.

Parts Included Qty

Tools Required

8mm x 1” bolts 4

13mm Ratchet with socket or Wrench

8mm nuts 4

5/16” Flat Washer 8

5/16” Lock Washer 8


Picture is for sample use, may not be actual bars



STEP 1:

Start by locating the driver’s side nerf step. To do so, locate the shorter tail bend. The short side goes to

the front of the vehicle.


STEP 2:

Locate the factory threaded holes, located under the door on the underside of the body of the vehicle.

NOTE: There will be black plastic caps covering the mounts. Remove all caps and discard.



STEP 3:

Hold the step up to the under body of the vehicle and align the factory studs in the body with the upper

mounts in the brackets of the nerf-steps. Install the two 8mm nuts, flat washers, and lock washers-hand
tighten.


Advertising
This manual is related to the following products: