Aries Automotive 201000-2 User Manual

Installation instructions

Advertising
background image

CH EROK EE

198 4 -2000 J EEP

P ART# 201000 / 201000-2


Page 1 of 2

PARTS LIST

1

Step

Bar Assembly,

Drivers Side

4

1/2”-13*2Hex Head Bolt

1

Step Bar Assembly,

Passenger Side

4

1/2”Flat Washer

2

Front Mounting Brackets

4

1/2”Lock Washer

1

Rear Mounting Bracket,

Driver Side

10

3/8*1”Self Tapping Hex Head

Bolt

1

Rear Mounting Bracket,

Passenger Side

PROCEDURE:

Step 1:

Remove all parts from the box and check for any damage.

Verify all parts are there.

Step 2:

Read and

understand all of the instructions before installing.

Step 3:

Install both front and rear mounting brackets onto the Step Bars using 4 of the 1/2”-13X2”

hex

head bolts,

4 1/2”

lock washer,

and 4 flat washers leaving them loose.

See Fig.1

Step 4:

Loosen the front rear spring bolt, enough to slide the slotted top edge of the rear bracket can be

slid underneath the head bolt. NOTE:

DO NOT REMOVE THIS BOLT.SEE Fig.2

Step 5:

Place the rear of the Step Bar to the Spring Bracket, and tighten the Spring Bolt until it holds the

rear Step Bar bracket in place.

See Fig.2

Step 6:

Hold up the front end of the Step Bar to the front of the sub frame .Check to be sure the Step Bar

is properly aligned with the Body and mark the holes to be drilled.

NOTE:

On some models be cautious of the diagonal oblong hole, it maybe necessary to locate the front

mounting bracket at an angle to miss this hole. See Fig 2.

Step 7: Drill the holes for the front bracket using the 5/16”

drill bit and electric drill.

Step 8: Secure the front Mounting Bracket to the sub frame using 4 3/8”

self tapping bolts. NOTE:

DO

NOT OVER TIGHTEN THESE BOLTS.

Step 9:

Tighten and torque 1/2”

fasteners to 65 ft. lbs., 3/8”-16X1 Hex Head Self Tapping Bolts to 20 ft.

lbs. And the Spring bolt to 70 ft. lbs.

INSTALLATION INSTRUCTIONS

Advertising
This manual is related to the following products: