Step 2, Optional bracket installation (f1da104z), Step 1 – Belkin F1DA108Z User Manual

Page 14

Advertising
background image

13

12

13

12

Installation

Note: If this PRO3 KVM Switch will be daisy-chained to another KVM switch, set
the BANK address prior to installing on a rack. Refer to the section in this User
Manual titled “Connecting Multiple PRO3 KVM Switches (Daisy-Chaining)”.
Your PRO3 KVM Switch is now mounted securely into the bracket and you are
ready to connect the console.

Optional Bracket Installation (F1DA104Z)

The PRO3 4-Port KVM Switch can be installed into a 19-inch server rack using
an optional OmniView Rack-Mount Kit (F1D005).

Step 1

Attach the rack-mount bracket to your 4-Port PRO3 KVM Switch using the
Phillips screws provided. (Refer to diagram below.)

Step 2

Mount the 4-Port PRO3 KVM Switch to the rack-rail assembly. (Refer to
diagram below.)

Advertising
This manual is related to the following products: