JLG 1850SJ Service Manual User Manual

Page 116

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-30

– JLG Lift –

3121619

29.

Apply a thin coat of moly paste on I.D. of sheave bear-
ings. Coat the bolts with JLG Threadlocker P/N 0100011
and install the sheaves to the front of section 3 using the
pin, keeper, bolt, and washer.

30.

Coat the bolts with JLG Threadlocker P/N 0100011.
Install the rope retaining blocks to the front of section 3
using washers, bolts, and nuts.

31.

Coat the bolts with JLG Threadlocker P/N 0100011.
Install the front side wear pads to section 3 using wash-
ers, bolts, and shims. Torque the bolts to 28 ft.lbs. (38
Nm).

32.

Coat the bolts with JLG Threadlocker P/N 0100011.
Install the front upper wear pads to section 3 using

washers, bolts, and shims. Torque the bolts to 28 ft.lbs.
(38 Nm))

Advertising