Inspection and maintenance table -3 – JLG 41AM Operator Manual User Manual

Page 23

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

3121211

– JLG Lift –

2-3

Table 2-1. Inspection and Maintenance Table

TYPE

FREQUENCY

PRIMARY

RESPONSIBILITY

SERVICE

QUALIFICATION

REFERENCE

Pre-Start
Inspection

Before using each day; or whenever there’s an Operator
change.

User or Operator

User or Operator

Operator and Safety Manual

Pre-Delivery Inspec-
tion
(See Note Below)

Before each sale, lease, or rental delivery.

Owner, Dealer, or User

Qualified JLG Mechanic

Service and Maintenance Manual
and applicable JLG inspection
form

Frequent
Inspection

In service for 3 months or 150 hours, whichever comes
first; or Out of service for a period of more than 3
months; or Purchased used.

Owner, Dealer, or User

Qualified JLG Mechanic

Service and Maintenance Manual
and applicable JLG inspection
form

Annual Machine
Inspection

Annually, no later than 13 months from the date of prior
inspection.

Owner, Dealer, or User

Factory-Trained
Service Technician
(Recommended)

Service and Maintenance Manual
and applicable JLG inspection
form

Preventative
Maintenance

At intervals as specified in the Service and Maintenance
Manual.

Owner, Dealer, or User

Qualified JLG Mechanic

Service and Maintenance Manual

NOTE:

Inspection forms are available from JLG. Use the Service and Maintenance Manual to perform inspections.

Advertising
This manual is related to the following products: