JLG 1200SJP Quick Reference Guide User Manual

Getting started controls and indicators

Advertising
background image

1200SJP/1350SJP Quick Reference

Getting Started

Controls and Indicators

Footswitch/Enable

Axles

Drive Orientation Override

1

2

3

4

5

6

7

8

9

Select platform controls

Pull out both E-Stops

Verify axles are extended

before lifting boom

Select appropriate platform

capacity

Enable footswitch

Select desired Boom Control

Operate Machine

- Ground Station

- Platform Station

Located at:

To enable the platform controls, step on the footswitch FIRST and then choose a function within

7 seconds. If no function is selected within 7 seconds, the Footswitch/Enable light will turn off and

the footswitch must be released and depressed again.

Axles must be extended and the Axle Set Light must be on to elevate the boom. To extend the axles,

select the axle extend switch while driving forward or reverse.

If operating drive and the Drive Orientation Light flashes, the drive controls may be opposite from the

intended driving direction. To continue: 1) verify the intended drive direction, 2) push and release

the Drive Orientation Override switch, and 3) operate drive within 3 seconds.

When the Platform Capacity is selected to the 500 lb (230 kg) position, the 500 lb

(230 kg) light will be on and the JLG control system will allow operation within the larger

envelope. The side swing jib can be used with this selection.

Platform Capacity Select/Jib Swing Function

Note: If both capacity lights are flashing, the boom or jib is out of the allowable

envelope. Remove platform load over 500 lb (230kg) and select the 500 lb

(230kg) capacity position.

When the Platform Capacity is properly selected to the 1000 lb (450 kg) position, the

1000 lb (450 kg) light will be on, and the JLG control system will allow operation within

the smaller envelope. The side swing jib must remain in the centered position with

this selection.

Boom Control Select

When the Boom Control is selected to the

position, lift and telescope movements are

coordinated by the JLG control system and the automatic platform leveling feature is active during

lift, swing, and drive movements.

Automatic

While operating Lift Up, the boom may also telescope out

While operating Lift Down, the boom may also telescope in

While operating Swing or Drive, the boom may lift up or lift down

While operating Telescope In, the boom may lift down when at

high boom angles and the creep light is flashing

When the Boom Control is selected to the

position, lift and telescope movements are

controlled separately by the operator and the automatic platform leveling feature is active only

during lift movements.

Manual

Note: When selected to the Manual position, the boom movements will be stopped

when the envelope limits are reached. If this occurs, operate the function in the

opposite direction, operate a different function, or select the Automatic position.

Boom Control System Warning

If operating a function causes the Boom Control System Warning Light to flash and the platform

alarm to sound, the selected movement is not allowed. To continue movement, operate the

function in the opposite direction or operate a different function.

WARNING!

The Boom Control System Warning Light may indicate contact

of the machine with another structure and continued movement

may result in damage to the machine or machine tip over.

!

JLG - 3128412 - 1-11-2006

500 lb MAX

230 kg MAX

1000 lb MAX

450 kg MAX

Creep Speed

The creep light acts as a reminder that all functions are set to the slowest speed. The light will be
on continuously if the creep switch is selected by the operator. The creep light will flash if the JLG
control system has selected this creep speed automatically. This occurs when the boom is near the
edge of the envelope or the Boom Control System Warning is active.

500 lb MAX

230 kg MAX

1000 lb MAX

450 kg MAX

STEP

STEP

STEP

STEP

STEP

STEP

STEP

STEP

STEP

Automatic

Manual

Note: When selected to the Automatic position, the coordination of boom movements

within the envelope is as follows:

Read the Operation and

Safety Manual. Perform

pre-start inspection.

Start Engine

Below 20°F (-7°C) run engine for

15 min. before operating machine.

Advertising
This manual is related to the following products: