General -8, Daily walk-around inspection - sht. 2 of 3 -8, General – JLG 3246ES Operator Manual User Manual

Page 27: Notice

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION & INSPECTION

3121165

– JLG Lift –

2-7

General

Begin the “Walk-Around Inspection” at Item 1, as noted on
the diagram. Continue Left (counterclockwise viewed from
top) checking each item in sequence for the conditions
listed in the following checklist.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS “OFF” DURING
“WALK-AROUND INSPECTION”.

NOTICE

DO NOT OVERLOOK VISUAL INSPECTION OF CHASSIS UNDERSIDE. CHECK-
ING THIS AREA OFTEN RESULTS IN DISCOVERY OF CONDITIONS WHICH
COULD CAUSE EXTENSIVE MACHINE DAMAGE.

NOTE: On each item, make sure there are no loose or missing

parts, that they are securely fastened, and that no visible
damage exists in addition to any other criteria men-
tioned.

1. Platform Control Console - Placard secure and legible,

control lever and switches return to neutral, control lever
lock and emergency stop switch function properly, man-
ual in storage box.

2. Steer Cylinder - See Note

3. Spindle, Tie Rod, Drive Motor and Steer Linkage (left

front) - See Note

4. Wheels and Tires - Properly secured, no missing lug nuts.

Refer to Section 6, Tires and Wheels. Inspect wheels for
damage and corrosion.

5. Pothole Protection System - See Note
6. Battery Compartment - Proper electrolyte level.
7. Proximity Switch - See Note
8. Manual Descent - See Note
9. Beacon - See Note

10. Ground Controls - Placard secure and legible, control

switches return to neutral position, emergency stop
switch functions properly. Control markings legible.

11. Rotary Angle Switch - See Note
12. Hydraulic Pump/Motor, Control Valve Installation - No

unsupported wires or hoses; no damaged or broken
wires - See Note

13. Lift Cylinder - See Note
14. Spindle, Tie Rod, Drive Motor and Steer Linkage (left

front) - See Note

15. Sizzor Arms, Pivot Pins and Sliding Wear Pads (Not

Shown) - See Note

16. Platform/Handrail Installation (Not Shown) - See Note

Figure 2-2. Daily Walk-Around Inspection - Sheet 2 of 2

Advertising