8.3.2 L

IFTING THE MACHINE USING ROPES OR CHAINS

The machine is equipped with 4 eyelets, positioned on the base, allowing to lift the machine
through 4 ropes or chains of suitable length and capacity.

The lifting devices must be in good conditions and used according to the specifications pro‑
vided by the manufacturer of the same.
To properly lift the platform it is necessary to use a sling bar of adequate size and features,
with a distance between hooks from 550 to 730 mm.
The minimum capacity required for each rope, chain or sling used must be sufficient to ensu‑
re the support of the whole structure to be lifted and their length must ensure that the sling
bar is positioned higher than the machine and that it does not touch the platform during the
lifting phases. The following pictures are the guidelines for machine lifting.

The manufacturer of the Platform is not responsible in any way for damages caused to the
machine, lifting device or persons and/or objects due to improper execution of this opera‑
tion.