JLG 450AJ ANSI Service Manual User Manual

Page 46

Advertising
background image

SECTION 2 - PROCEDURES

2-28

– JLG Lift –

3120749

4.

Place DRIVE control lever to FORWARD position
and carefully drive machine up ascension ramp until
left front wheel is on top of block.

5.

Carefully activate SWING control lever and position
boom over right side of machine.

6.

With boom over right side of machine, place DRIVE
control lever to REVERSE and drive machine off of
block and ramp.

7.

Have an assistant check to see that left front wheel
remains locked in position off of ground.

8.

Carefully activate SWING control lever and return
boom to stowed position (centered between drive
wheels). When boom reaches center, stowed posi-
tion, lockout cylinders should release and allow
wheel to rest on ground, it may be necessary acti-
vate DRIVE to release cylinders.

9.

Place the 6 inches (15 cm) high block with ascen-
sion ramp in front of right front wheel.

10.

Place DRIVE control lever to FORWARD and care-
fully drive machine up ascension ramp until right
front wheel is on top of block.

11.

Carefully activate SWING control lever and position
boom over left side of machine.

12.

With boom over left side of machine, place DRIVE
control lever to REVERSE and drive machine off of
block and ramp.

13.

Have an assistant check to see that right front wheel
remains locked in position off of ground.

14.

Carefully activate SWING control lever and return
boom to stowed position (centered between drive
wheels). When boom reaches center, stowed posi-
tion, lockout cylinders should release and allow
wheel to rest on ground, it may be necessary acti-
vate DRIVE to release cylinders.

15.

If lockout cylinders do not function properly, have
qualified personnel correct the malfunction prior to

any further operation.

TIE

ROD

SPINDLE

OSCILLATION

CYLINDER

LOCKOUT

VALVE

AXLE

PIVOT

PIN

Figure 2-24. Front Axle

Advertising
This manual is related to the following products: