3 engine operation, Starting procedure, Engine operation -2 – JLG 860SJ Operator Manual User Manual

Page 62: Starting procedure -2

Advertising
background image

SECTION 4 - 3MACHINE OPERATION

4-2

– JLG Lift –

3121630

TO AVOID FORWARD OR BACKWARD TIPPING, DO NOT OVERLOAD MACHINE OR OPER-
ATE THE MACHINE ON AN OUT-OF-LEVEL SURFACE.

4.3

ENGINE OPERATION

NOTE:

Initial starting should always be per-
formed from the Ground Control con-
sole.

Starting Procedure

IF ENGINE FAILS TO START PROMPTLY, DO NOT CRANK FOR AN EXTENDED TIME.
SHOULD ENGINE FAIL TO START AGAIN, ALLOW STARTER TO “COOL OFF” FOR 2-3 MIN-
UTES. IF ENGINE FAILS AFTER SEVERAL ATTEMPTS, REFER TO ENGINE MAINTENANCE
MANUAL.

NOTE:

Diesel engines only: After turning on ignition,
operator must wait until glow plug indicator light
goes out before cranking engine.

1.

Turn key of Platform/Ground Select switch to
Ground.

2.

Pull the Power/Emergency Stop switch to On.

3.

Push the Engine Start switch until engine starts.

ALLOW ENGINE TO WARM-UP FOR A FEW MINUTES AT LOW SPEED BEFORE APPLYING
ANY LOAD.

4.

After engine has had sufficient time to warm
up, push in the Power/Emergency Stop switch
and shut engine off.

5.

Turn Platform/Ground Select switch to Plat-
form.

Advertising
This manual is related to the following products: