SECTION 4 - 3MACHINE OPERATION

3121630

– JLG Lift –

4-15

Tie Down

WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY LOWERED INTO
THE BOOM REST.

1.

Remove all loose items from the machine.

2.

When transporting an 800S/860SJ a step-deck or single-
drop trailer is required. To avoid damage to the platform and
to obtain proper weight distribution, load the machine onto
the trailer as follows;

a. Position the boom over the front wheels.

DO NOT SWING THE BOOM WHIT THE MACHINE POSITIONED ON A TRAILER. TIPOVER
MAY RESULT

b. Place the boom in the stowed position with the turnta-

ble locked.

DRIVE AND STEER CONTROLLERS WILL BE REVERSED WHEN THE BOOM IS POSI-
TIONED OVER THE FRONT WHEELS.

c. Drive it onto the trailer with the boom and platform

positioned towards the truck. Refer to Figure 4-5., Typi-
cal 800S/860SJ Transport.

3.

Secure the chassis and the platform using straps or chains of
adequate strength.