Step 17, Step 18, Step 19 – Aladdin Light Lift ALL300RM-CM-240V User Manual

Page 11

Advertising
background image

STEP 17

Attach conduit assembly to 3/4” conduit connector mounted below chandelier pulley. Once completely

inserted, tighten set screw on conduit connector. See Diagram K.

Never attach or adjust the conduit assembly improperly. This could interfere with the automatic shutoff

system and could cause the chandelier to fall, which could cause death, personal injury, and/or property

damage.

STEP 18

Attach 1/2” conduit connector on ceiling box to bottom of conduit assembly. Once completely inserted,

tighten set screw on conduit connector. See Diagram K.

Never attach or adjust the conduit assembly improperly. This could interfere with the automatic shutoff

system and could cause the chandelier to fall, which could cause death, personal injury, and/or property

damage.

STEP 19

Position chandelier pulley assembly where ceiling box will be centered in ceiling hole. Weight and bottom

contact plate assembly should hang down through ceiling hole. See Diagram K.

3/4” Conduit

Connector

Telescopic Conduit Assembly

1/2” Conduit Connector

ALL300RM Ceiling Box

Sheetrock

Sheetrock

4 1/2”(11.4 cm) Hole

Diagram K

Advertising
This manual is related to the following products: