Overview of installation – Allen&Heath GR05 User Manual

Page 6

Advertising
background image

6

GR05 User Guide

Overview of Installation

Before starting make sure you have read this User Guide and understand the full
capabilities of the

GR05. Plan the complete system first to decide how the

GR05 should be configured. Make sure you know the operating levels of the
equipment to be interconnected. To configure the unit you need to remove the
top cover and set internal links and trimmers. These adjust input and output
level matching, EQ, routing, ducking and level control. To complete the
installation configure the front and rear panel controls and set the unit for rack or

desk mounting. Log the details on the Configuration Sheet provided at the rear
of this guide. Remember to check the complete system for correct operation
after configuration.

The next page summarises the installation process. For full details on each
stage please refer to the page numbers indicated.

Advertising