Anchor EVENT AND VENUE LINER User Manual
Liner installation instructions, For event & venue series anchor structures
Advertising
LEV 0413
EC4665
Liner Installation Instructions
for Event & Venue Series
Anchor Structures
SALES OFFICES:
1100 BURCH DRIVE
PO BOX 3477
EVANSVILLE, IN 47733 USA
PRODUCTION FACILITIES:
EVANSVILLE, IN
PHONE: 812-867-2421
FAX: 812-867-0547
1-800-544-4445
E-MAIL: [email protected]
www.anchorinc.com
Liner for Mid
Gable End Liner
with Mid Attached.
Important: Read these instructions BEFORE frame assembly.
Note:
If there is no access to the bottom rafter kedar channels, kedared buckles must be inserted into the
appropriate channels BEFORE rafters are attached to frame. See step 9 for instructions. Disregard if there is
access to the bottom rafter kedar channels.
Eave cables must be attached to uprights. This may be done just prior to liner installation. See step 5.
Advertising