Figure b ) – Anchor FUNBRELLA PALM User Manual

Page 3

Advertising
background image

FUNBRELLA PALM PARTS LIST

ITEM NO. QUANTITY

DESCRIPTION

1

1

Pole Assembly

2

10

Rafters

3

10

Braces

4

1

Pressure Plate

5

20

3/8” x 1 3/4” Hex Head Bolt

6

10

3/8” x 1 1/4” Hex Head Bolt

7

30

3/8” Lock Nut

8

2

3/8” x 5” Hex Head Bolt

9

2

3/8” Cap Nut

MANPOWER REQUIRED

Two experienced installers should be able to assemble
a Funbrella Palm top & frame in two hours.

TOOLS REQUIRED

9/16” Wrench • 5/8” Wrench • 3/4” Wrench
(2) 10’ Stepladders
(1) 16’ Extension Ladder
Post Hole Digger (optional...required only to dig
hole for ground sleeve)
(2) Cable Come-A-Longs (minimum 800 lb. rating,
minimum 10’-0” pull) - sold separately

INSPECT SITE - CAUTION

Consult local Utility Company prior to installation.
Prior to assembly be sure to look around for obsta-
cles, pipes, wires and etc.

LAYOUT & CHECK

Use parts list for a quick identification and check list
for proper quantities.

SET GROUND SLEEVE (SOLD SEPARATELY)

Dig a 1’-3” minimum diameter hole 3’-1” deep or as
required by soil conditions or local code. Add 3” of
gravel. Insert ground sleeve with 6” square plate on
bottom. Ground sleeve is marked with red tape indicat-
ing finished grade level.

(Figure B)

Plumb sleeve and brace into position during concrete
pour.

Fill concrete to cover red tape. Allow to dry for 72
hours before mounting Funbrella Palm center pole.

2

Finish Grade

10’-0”

4’-4”

8’-6”

13’-6”

Ground Sleeve

Rafter in Open
Position.

Rafter in Closed
Position.

Brace in Open
Position

Brace in Closed
Position.

Bottom Hub in
Closed Position.

Bottom Hub in
Open Position.

CenterPole

Figure A

Figure B

Warning: Do not install groundsleeve

or center pole where they may be in

contact with water from swimming

pool or any other body of water.

Advertising