Anchor MESH POOL COVER GROUND TUBES AND STAKES User Manual

Installation instructions for, Ground tubes and stakes

Advertising
background image

GTP 0811

INSTALLATION INSTRUCTIONS FOR

EC4415

GROUND TUBES AND STAKES

Water in pool

Pool Cover

Ground tube

Water in pool

Water in pool

Do not angle pool cover ties or springs down to
soil level. Spring or Tie may fl y off. Soil must
be built-up to deck of pool level.

Always place stake or ground tube as close to
pool deck as possible.

Pool Deck

Pavers Setting

Bed

Pool Deck

Pool Deck

Earth

Pavers. Drill 1” diameter hole thru paver for
ground tube. Drill 1/2” diameter hole for stake.
Top of ground tube must be fl ush w/top of
paver. IMPORTANT: Do not install Ground
tube in fi rst row of pavers adjacent to pool.

Figure 1

Figure 2

Figure 3

Figure 4

Top of ground tube must be flush
with top of ground.

Stake

Top of stake must not be more
than 3/4” above top of ground.

Pool Cover

Spring or tie

Spring or tie

Ground tube

Earth

Earth

Spring or tie

Important: Consult paver
manufacturer for drilling
recommendations.

Pool Deck

Inspect Site!

Caution:

1. Consult your local utility locator service or the
National Utility Locating Contractors Association
(NULCA) prior to installation.
2. Consult design information on pool for plumb-
ing/electrical line placement.

1. For each installation the installer is solely
responsible for evaluating the site and determin-
ing the proper method and equipment to secure
the cover. Some soils require different staking or
securing than that provided with the pool cover.
Due to this variety of soil conditions, the installer
must insure proper anchoring at each anchor
point.

2. This instruction sheet must be used along
with the pool cover installation instruction manual
included with your pool cover.

3. The soil at the installation site of each stake/
ground tube must be capable of allowing the
cover to support the minimum loads of ASTM
F-1346 after installation.

4. Testing of soil conditions and responsibility for
load verifi cation is solely the responsibility of the
installer.

One ground tube per tie or spring.

GROUND TUBE IN SOIL

STAKE IN SOIL

GROUND TUBE THRU PAVERS

1’-3”

One stake per tie or spring.

1’-5”

9”

Pool Cover

Advertising