Installation instructions, Figure 10 general arrangement – drape – Autoquip VERTICAL RAM LIFTS - DUAL RAM User Manual

Page 24

Advertising
background image

24

CONCRETE IS POURED

OIL LINE TO RUN BEFORE

(BY PIT CONTRACTOR)

(BY PIT CONTRACTOR)

PIPE CHASES

CONNECTING PIPE

REMOTE POWER UNIT

LOCATE WHERE CONVENIENT

( BY PIT CONTRACTOR)

CLEAN SAND BACKFILL

(BY INSTALLER)

REINFORCING BAR

WELDED TO CASING

(BY PIT CONTRACTOR)

3 6" APPROX.

(BY PIT CONTRACTOR)

STEEL CASINGS

4 2" X 42" X 1 / 4" WALL

PIT DEPTH

SECTION " A- A "

FOOTING

TIE ROD

RAM

RAM LENGTH

FOOTING

UNION

" A "

HANDRAILS AND

SNAP CHAINS NOT

SHOWN FOR CLARITY.

1" TYP.

LIFT

TRAVEL

(PLATFORM WIDTH + 2")

PIT WIDTH

" A "

RAM SETTING DIM

TO TOP OF RAM FLANGE

(BY PIT CONTRACTOR)

CONCRETE BUMPERS

RAM WASHER

BLACK STRIPED TAPE.

BEVEL TOE GUARDS ON ( 4)

SIDES WITH YELLOW AND

1 " TYP.

PLATE

( 4) CORNERS

RAM C.L.

ELBOW

UNION

CURB ANGLES

"

(PLATFORM LENGTH + 2" )

" PIT LENGTH

18"

TYP.

18"

TYP.

Figure 10 General Arrangement – DRAPE

INSTALLATION INSTRUCTIONS