BAND-IT Ties Installation User Manual

Band-it ties, Installation instructions

Advertising
background image

BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925

Page 1 of 1

BAND-IT Ties

BAND-IT Company Limited
A Unit of IDEX Corporation
Speedwell Industrial Estate
Staveley, Nr. Chesterfield
Derbyshire, S43 3PF England
P: (44) 1246-479479
F: (44) 1246-479480

BAND-IT Clamps (Asia) Pte. Ltd.
11 Second Chin Bee Road
Singapore 618777
P: 65-6265-8853
65-6265-8783
F: 65-6265-8902

www.BAND-IT-IDEX.com

www.BAND-IT.co.uk

Document # P91787 rev. F

© Copyright

BAND-IT-IDEX, Inc. 2008

All rights reserved

www.BAND-IT-clamps.com

Installation
Instructions























Refer to website for warranty information:

http://www.band-it-idex.com/warranty.html

Maximum Operating Temperature: Coating = 300

°F (149°C)


Rated Load (Loop Tensile Strength, single wrap) :

1/4” Tie = 75 LBS

3/8” Tie = 100 LBS

5/8” Tie = 200 LBS


Rated Load (Loop Tensile Strength, double wrap) :

1/4” Tie = 300 LBS

3/8” Tie = 500 LBS

5/8” Tie = 800 LBS

1. Wrap BAND-IT tie around object with the
locking ears up. Wrap per diagram at left.

2. Tighten BAND-IT ties with one of these
(listed in order of increasing tension):

• By

hand,

• BAND-IT AE201 Tensioning Hook,

• BAND-IT AE200 Tensioning Tool,

• BAND-IT C075 Bantam Tool.

3. Bend tail back over raised bridge.


4. Secure tail under ears by slightly pushing
the tail sideways and down, first one way
then the other.




5. Tail may be left on for re-use.

6. Optional: Hammering down the bridge may
increase the strength of the lock, but will not
allow the clamp to be re-used.

Advertising