Installation, Unpacking and handling, Location and clearance – BKI FS Countertop Rotisserie Oven User Manual

Page 13: Wiring

Advertising
background image

Countertop Rotisserie Oven

Installation

11

Installation

Serious injury, equipment damage or death could result if attempting to install this oven
yourself. Ensure that an authorized BKI service agent installs the oven.

Unpacking and Handling

It is the owners’ responsibility to file all freight claims with the delivering truck line. Inspect all cartons and crates
for damage as soon as they arrive. If damage to cartons or crates is found, or if a shortage is found, note this on
the bill of lading (all copies) prior to signing.

If damage is found when the equipment is opened, immediately call the delivering truck line and follow up the call
with a written report indicating concealed damage to your shipment. Ask for an immediate inspection of your
concealed damage item. Packaging material MUST be retained to show the inspector from the truck line.

Remove all packing from the interior and exterior of the oven.

Location and Clearance

Underwriters Laboratories requires that the oven have at least 6" clearance from combustible

surfaces at the rear

of the machine.

Wiring

Electrocution, equipment failure or property damage could result if an unlicensed
electrician performs the electrical installation. Ensure that a licensed electrician perform
the electrical installation in accordance with local codes, or in the absence of local codes,
with the National Electrical Code, ANSI NFPA 70-20XX.


This unit, when installed by an authorized BKI service agent, must be wired for use in accordance with all
applicable local, state, and federal codes. For specific electrical requirements and connections refer to the wiring
diagram attached to the unit or provided in the Service Manual.

Advertising