C.B.S. Scientific DCX-800 User Manual

Page 9

Advertising
background image

9

www.cbsscientific.com

4

5. Slide pre-cast gel cassette or plate set(s) into

the core assembly with the notched plate
facing in towards the upper buffer reservoir
as shown in figure 4. If using a pre-cast gel
stored at 4°C, allow to warm to room tem-

perature. If pouring your own gels please see
Alternate Protocol (Section 4) on pages 12-
14 describing gel casting using Gel Wrap™.

6. If running one gel, slide white plastic adaptor

plate into the side without the gel. If running
a Lonza 10cm x 9cm gel casssette place
clear shim as shown in figure 5.

7. Close doors and relatch by pressing down

on the white latches so that the assembly
looks like that shown in figure 6.

5

6

Advertising
This manual is related to the following products: