CHAMPION UL-130 Installation Instructions User Manual

Attention installers, Location, Fill booster tank

Advertising
background image

Undercounter Installation Instructions (High Temp.)

Attention Installers

All plumbing and electrical connections must be made by qualified installers in accordance

with all local plumbing and electrical codes.

Plumbing connections must be made BEFORE power is connected to the dishwasher.

Damage to the water heaters will result if power is turned on without adequate water supply.

!

!

All plumbing and electrical connections must be positioned to allow the unit to be removable

for service and cleaning.

!

1

Location

Place dishwasher in permanant location
Level dishwasher with 4 leveling feet
Level side to side and front to back
Remove front Panel

Booster Service Switch is located on the left side of

chemical pump bracket
Push Service Switch to “Booster Fill” position and

hold until water enters wash tank
Push Service Swtich to the “On” position.
Replace front panel. Installation is complete!

5

Fill Booster Tank

ON

OFF

Booster Fill

6 ft. fill hose supplied
3/4” garden hose fitting

2

Hot Water Supply

Hot Water Connection

Min. 140°F (60°C) for 40° rise
@ 20 PSI (138kPa) min. flow pressure
Min. 110°F (43°C) for 70° rise
@ 20 PSI (138kPa) min. flow pressure
Min 1/2” water supply line

4 ft. clear braided
drain hose supplied

3

Drain Connection

3/4” MNPT
by 5/8” hose adaptor

1-1/2” Wye fitting

* Maximum drain height: 3 ft.

0512242

REV

C

Remove front panel
Remove connection
box cover

Single Phase

208-240/60/1

115V split connection

3 wire plus ground

wire rated min 190°F (88°C)

Check data
plate for
electrical
power
requirements

4

Electrical Connections

L1

1

L2
L3

2

N

N

3

G

208/

240V

115V

115V

L2

L1

Neutral

Advertising
This manual is related to the following products: