Installation instructions – CHAMPION EUCC Series User Manual

Page 42

Advertising
background image

34

Installation Instructions _______

Section Assemby

Section Assemby

21. The Installation Supervisor must

inspect the position, level and

proper connection of the piping

connections.

22. Section joints must be capped by

section u-clips and silicon must

be trimmed around the hood

joints.

23. Steam supply and condensate

unions must be tight.

24. Drain piping must be checked.

25. Cross-flow hoses must be

inspected and clamps tightened.

26. Flushing nozzle piping on the

load end must be inspected.

20. The installation is close to

completion.

Advertising