Clarus Environmental Centrifugal STEP Vaults User Manual

Installation instructions, Centrifugal step vault stand, Detail 1 detail 2

Advertising
background image

© Copyright 2012. All rights reserved.

Product information presented here reflects conditions at time of publication. Consult factory regarding discrepancies or inconsistencies.

Centrifugal STEP Vault Stand

SECTION: C1.60.125

CL0135

0512

Supersedes

New

3649 Cane Run Road . Louisville, KY 40211-1961

877-244-9340 . Fax: 877-414-4316

www.clarusenvironmental.com

®

®

INSTALLATION INSTRUCTIONS

5040 CENTRIFUGAL

STEP STAND

CAST IN

RISER

5040 STEP

VAULT AND

PUMP

BE SURE HOLES

IN 90° ELBOWS ARE

LOCATED ON TOP

DURING ASSEMBLY

LEG EXTENSIONS

ADDED BY THE

INSTALLER

1" X 39" SCH 40

PVC PIPE

(4 REQ'D)

1" X 11" SCH 40

PVC PIPE

(4 REQ'D)

1" 4 WAY TEE

(4 REQ'D)

S.S. SCREWS

(4 REQ'D)

POST SEPTIC TANK APPLICATION

CAST IN RISER APPLICATION

ASSEMBLY VIEW

EXISITING PIPE HANGER
(CUT TO 11” WHEN USED

WITH THE VAULT STAND)

Detail 1

Detail 2

SK2897

Assembling Leg Extensions:

Determine the length needed of 1" SCH 40 PVC pipe for the leg

extensions and glue the appropriate length pipe into the bottom of

the 4-way tee. Install unit as per typical installation. See Detail 2.

Field Assembly of Stand:

Remove existing pipe hangers and cut to

11", then reinstall. Follow the assembly

layout in Detail 1 for completion.

Advertising