ETC Unison Paradigm Repeater Rack Mount User Manual

E t c, Paradigm rack mount repeater installation, Paradigm rack mount repeater

Advertising
background image

E T C

®

S e t u p G u i d e

Paradigm Rack Mount Repeater Installation

.c

n

I

,

sl

o

rt

n

o

C

e

rt

a

e

h

T

c

in

o

rt

c

el

E

3

f

o

1

e

g

a

P

e

di

u

G

p

u

t

e

S

r

e

t

a

e

p

e

R

t

n

u

o

M

k

c

a

R

m

gi

d

a

r

a

P

Corporate Headquarters

3031 Pleasant View Road, P.O. Box 620979, Middleton, Wisconsin 53562-0979 USA

Tel +608 831 4116

Fax +608 836 1736

London, UK

Unit 26-28, Victoria Industrial Estate, Victoria Road, London W3 6UU, UK

Tel +44 (0)20 8896 1000

Fax +44 (0)20 8896 2000

Rome, IT

Via Pieve Torina, 48, 00156 Rome, Italy

Tel +39 (06) 32 111 683

Fax +44 (0) 20 8752 8486

Holzkirchen, DE

Ohmstrasse 3, 83607 Holzkirchen, Germany

Tel +49 (80 24) 47 00-0

Fax +49 (80 24) 47 00-3 00

Hong Kong

Rm 1801, 18/F, Tower 1 Phase 1, Enterprise Square, 9 Sheung Yuet Road, Kowloon Bay, Kowloon, Hong Kong

Tel +852 2799 1220

Fax +852 2799 9325

Service: (Americas)

[email protected]

(UK)

[email protected]

(DE)

[email protected]

(Asia)

[email protected]

Web:

www.etcconnect.com

Copyright © 2010 ETC. All Rights Reserved.

Product information and specifications subject to change.

7182M2261

Rev A

Released 2010-10

ETC intends this document to be provided in its entirety.

Paradigm Rack Mount Repeater

The Paradigm rack mount repeater can contain a single or dual repeater. Installation procedures for the

single or dual repeater unit are identical.

The Paradigm repeater is designed for use with a Paradigm control system to supply LinkPower for up

to 62 Paradigm control stations on the topology-free and polarity-independent LinkPower control

network.

Rack Mount Installation

Install Unit in Equipment Rack

Step 1:

Locate the

included

rack mounting hardware kit including the mounting screws and

washers.

Step 2:

Use the hardware provided to mount the unit to the mounting rails in your equipment rack.

Power and Control Wiring

The rack mount enclosure is provided with wiring connections on the rear of the unit. Required

terminations include:

• Connect a single phase 115 VAC, 230 VAC, or 240 VAC power input to the IEC connector.

• LinkPower (Belden 8471 or approved equal) for the station communication bus. All stations must

be grounded by using grounded metal conduit or a 14 AWG ESD drain wire per run. Two

LinkPower wire runs are required including:

One run from the associated Paradigm Station Power Module (P-SPM) which terminates

on the two pin header labeled J2 on the repeater I/O board.

One LinkPower run (or more as desired) for station data and power out. These runs

terminate to the removable pluggable connector labeled LON on the repeater I/O board.

N o t e :

LinkPower includes one pair of wires (data+ and data -). The total combined length of

a LinkPower wire run cannot exceed 1,640 feet (500m), with a maximum distance of

1,313 feet (400m) between any two devices.

Advertising