Overview of this manual – ETC Sensor+ Portable Pack CEM+ to CEM3 Retrofit User Manual

Page 5

Advertising
background image

Introduction

3

Overview of this Manual

Reference this manual throughout the retrofit procedure.

Preparation, page 7

- emptying the rack and removing the external components

Remove the CEM+ Backplane, page 8

- remove the existing backplane from the pack

Replace Phase A Bus Bar, page 9

- remove the old bus bar and install a new one

Attach New Power Harness, page 10

- install and secure the power wire harness

adapter

Install CEM3 Backplane, page 10

- install the new backplane and connect and secure

the data cabling

Replace AF Cards (AF Packs Only), page 12

- remove the existing Advanced Feature

cards and install the new ones

Install New Pack Lid and Reassemble Pack, page 13

- install the new pack lid and

reassemble the external components

When viewing this document in electronic form (.PDF file) with Adobe Acrobat Reader, blue

italicized text followed by a page number such as “

Overview of this Manual, page 3

” is a

link within the document. By clicking on the link, you can jump to that section or topic.