Connect the wiring, Unison, Heritage receptacle station – ETC Unison Heritage Portable Receptacle Station User Manual

Page 2

Advertising
background image

E T C I n s t a l l a t i o n G u i d e

Unison

®

Heritage Receptacle Station

Unison

®

Receptacle Station Installation Guide

Page 2 of 3

Electronic Theatre Controls, Inc.

Connect the Wiring

Step 1:

Pull all required wiring to the backbox.

Step 2:

Terminate and connect LinkPower. LinkPower is topology free and polarity independent.
You may install LinkPower in any combination of bus, loop, star or home-run.

a: Locate the LinkPower pigtail and two WAGO cage clamp connectors from the termination

kit.

b: Strip 3/8” (9-10mm) from the ends of each LinkPower wire (both pigtail and installed

LinkPower wire).

c: Use the WAGO cage clamp connector to connect the installed control wire to the

connectorized pigtail wires provided. Open the terminal levers on the WAGO connector
and insert the installed (typically black) Belden 8471 LinkPower wire and the black lead
from the LinkPower pigtail into the terminals.

d: Close the levers onto the wires.
e: Repeat for the installed (typically white) Belden 8471 LinkPower wire and remaining pigtail

wire using a new WAGO connector.

f: Install the LinkPower connector to location J2 (NET) on the Receptacle Station control

board.

Step 3:

Terminate and connect Auxiliary Power (24 Vdc) wiring.
a: Locate the Auxiliary Power pigtail and two WAGO cage clamp connectors from the

termination kit.

b: Strip 3/8” (9-10mm) from the ends of each Auxiliary wire (both the provided pigtail and

installed wire).

c: Use the WAGO cage clamp connector to connect the installed power wire to the

connectorized pigtail wires provided. Open the terminal levers on the WAGO connector
and insert the installed (typically black) 16 AWG (1.5mm2) Auxiliary Power wire and the
black lead from the pigtail into the terminals.

d: Close the levers onto the wires.
e: Repeat for the installed (typically red) 16 AWG (1.5mm2) Auxiliary Power wire and

remaining pigtail wire using a new WAGO connector.

f: Install the Auxiliary connector to location J1 (Aux) on the Receptacle Station control board.

Step 4:

Terminate the ESD drain (ground) wire. This connection is required when the control
cable is not installed in grounded metal conduit.
a: Locate the ground wire pigtail and one WAGO cage clamp connector from the termination

kit.

a: Strip 3/8” (9-10mm) from the end of each ground wire (both the provided pigtail and the

installed wire).

b: Use the WAGO cage clamp connector to connect the installed ground wire to the pigtail

wire provided. Open the terminal levers on the WAGO connector and insert the installed
(typically green/yellow) ESD drain (ground) wire and the green/yellow lead from the pigtail
into the terminals.

c: Close the levers onto the wires.
d: Install the ground spade (location J4) to the receptacle on the Receptacle Station control

board.

topology of a single

station installation

topology of multiple

stations installed in

series

installed control wire

pigtail wire

installed control wire
installed control wire to next station
pigtail wire

Advertising