Flex TPO Split Pipe Boots User Manual

Page 2

Advertising
background image

_____________________________________________________________________________________________________

Flex Membrane International Corp. 2670 Leiscz’s Bridge Road, Suite 400, Leesport, PA 19533

Tel: (610) 916-9500 Fax: (610) 916-9501 www.FlexRoofingSystems.com


Page 2

8. Tack weld the back edge of the pipe-seal’s vertical leg ensuring that good contact is maintained

between the pipe seal and the pipe. This process will hold the pipe-seal in place.

9. Heat-weld the entire width of the vertical overlap. Hand roll against the outer surface of the pipe

to create the pressure necessary to achieve an acceptable weld.

10. Heat-weld the base flange to the deck membrane and complete the horizontal overlap weld.

11. Install a stainless steel universal clamping ring to provide constant compression of the sealant.

12. Apply Flex TPO Cut-Edge Sealant to all edges of the pipe-seal that are located on the horizontal

plane. Do not apply the sealant to vertical surfaces.

CAUTIONS AND WARNINGS

· Remove all lead and other flashing.
· Temperature of pipe must not exceed 180°F (82°C).

· Install a minimum of four fastening plates around pipe penetrations. Position

· fastening plates around the penetration so the plates are covered by the pipe-seal

· flange. A minimum 1-1/2 inch wide weld must be maintained around the outer

· edge of the flange beyond the plates. If fastening plates cannot be installed in a

· manner to allow a minimum 1-1/2 inch weld, the plates must be placed outside the

· pipe-seal flange and covered with a reinforced Flex overlay.

· Store pipe Boot in a cool, shaded area and cover with light-colored, breathable,

· waterproof tarpaulins. Flex TPO Split Pipe-Boot or membrane that have been

· exposed to the weather for approximately 7 days or longer prior to use must be

· prepared with Flex Weathered Membrane Cleaner prior to hot air welding.