Install support system – Best IEX42 User Manual

Page 7

Advertising
background image

- 7 -

INSTALL SUPPORT SYSTEM

1. At hood location, install 2 X 4 cross framing

between ceiling joists using dimensions
shown.

2. Finish the ceiling surface. Be sure to mark

the location of the ceiling joists and cross
framing.

3. Position the support frame as shown. The

UP ARROW should point towards the ceiling
after installation.

4. Secure the upper half of support frame to

joists and cross framing with four screws
(6x70mm and four washers (D.6.4mm).
Make sure screws are driven into center of
joists and framing for maximum strength.

5. Adjust the overall height of the support frame.

Loosen and re-tighten the 4 screws in the
height adjustment slots as necessary.
Insert 4 screws (3.9x9.5mm) and 4 washers
(D.4.5mm) located in the Hardware
Package.

Note that the hood height is 10” and that the
bottom of the hood must be 24” min. and 30”
max. above the cooktop.

CEILING

JOISTS

CROSS FRAMING

FRONT

HEIGHT

ADJUSTMENT

SLOTS

SUPPORT

FRAME

9

13

/

16

DRYWALL

MOUNTING

SCREWS

(6x70mm)

WASHERS

(Ø6.4mm)

TOP VIEW OF

SUPPORT FRAME

9

13

/

16

7

13

/

16

Advertising