Koolance HDC1-A01 User Manual

Koolance Hardware

Advertising
background image

Hard Drive Cooler Installation Guide

v 2.00

Once mixed, the dual-pack of thermal encapsulate
material will serve as the heat transfer pad between
your drive and the cooling plate. It is not electrically
conductive, and the material can be peeled-off after it
has dried (after 60 hours). Hard drives may be used
while the encapsulate is drying.

Hard Drive Cooler Installation Guide

CAUTION

:

Because the encapsulate can only be used once,

Koolance recommends formatting and installing software onto a new
hard drive to verify a drive defect before installing the liquid cooler.
Additional thermal packs are available with “second hard drive kits”
from your Koolance reseller.

!

Fold the dual-pack of encapsulate in half, and cut
a corner across, so that both compounds can be
squeezed-out together.

Compress the entire pack over a sheet of paper until
the contents are empty.

CAUTION

:

The original hard drive manufacturer may not honor the

warranty if residue from the encapsulate material remains after
removal. If you have any questions on warranty coverage, please
contact your drive’s manufacturer.

!

Using a spoon or mixing
utensil, stir the
encapsulate like paint
until it is one complete
solid color.

Advertising
This manual is related to the following products: