Pro hypercharger, Installation – Kuryakyn 9423 HYPERCHARGER for YAMAHA User Manual

Page 2

Advertising
background image

PAGE

2


STEP 1

Read and understand all steps in the instructions before starting the installation. Park the

motorcycle on a hard, level surface and turn off the ignition. Let cool.

DISCLAIMER — PLEASE READ BEFORE PROCEEDING

Any modifications to a motorcycle’s exhaust or intake tract require carburetor re-jetting to

achieve

maximum

performance and maintain drivability. If you are uncomfortable with the

process of tuning your carburetor, we recommend that you bring your motorcycle to a qualified

motorcycle mechanic to have this kit installed. The jets included in this kit were selected based

on test results with various combinations of components that we felt would represent the

majority of the customers purchasing this kit (see Addendum I). However, no two motorcycles

are exactly alike. Depending on the individual case, additional jets may need to be purchased

from an outside source. Küryakyn warrants the parts included in this kit to be free of defects in

materials and workmanship, but makes no claim whatsoever in regard to costs associated with

installation

or

tuning.

WARNING! YOU WILL BE WORKING AROUND THE ENGINE AND EXHAUST SYSTEM

DURING

INSTALLATION.

ENSURE

THAT THE ENGINE AND EXHAUST SYSTEM

HAVE FULLY COOLED TO PREVENT INJURY.


ATTENTION!

A factory service manual may be helpful in performing this installation. Do not attempt

to perform this installation if you are not confident in your ability to complete all of the

steps

in

the

procedure;

consult a trained technician

.

CAUTION! The installation of any high performance exhaust system can
cause

a

“lean”

fuel/air

mixture. A “lean” fuel/air mixture can

cause engine overheating resulting in severe engine damage.

Küryakyn

recommends

rejetting carbureted bikes.

NOTE:

This installation requires re-jetting of the carburetors. This is an involved

procedure that we recommend be performed by a qualified service

technician. If you choose to attempt this procedure yourself, refer to the

carburetor

removal,

disassembly,

reassembly, and installation procedures

outlined in your V-Star service manual.

STEP 2

Remove the driver and passenger seats from the bike. Remove the negative

battery cable from the battery and tuck it out of the way to reduce the possibility

of sparks.


STEP 3

Remove the two, rear tank mounting bolts. Remove the plastic tank mounting

snap stud. (Push in on the center of it to release). Slide the tank back to expose

the top of the engine. Make sure the tank is secured so it does not fall! You may

remove the tank completely if so desired.


STEP 4

Remove the stock air cleaner cover, element, and backing plate. The top and rear

mounts are secured with screws, the front mount “snaps” into a grommet.


STEP 5

See PIC.1 and PIC.2. Remove the grommet from the bracket.


STEP 6

Placing your long handled Phillips screwdriver as shown in PIC.3, loosen the clamp

on the air duct and remove the duct. Remove the clamp from the duct and set it

aside, as it will be reused.

NOTE:

Now is a good time to proceed with re-jetting of the carburetors. Consult

your factory service manual for this procedure. We have supplied jets to

cover most common applications.

PRO

HYPERCHARGER

INSTALLATION

-cont.-

PIC 1

PIC 2

PIC 3

REMOVE THIS GROMMET

LOOSEN THIS CLAMP

Advertising