Ride on, Iso grips, Installation – Kuryakyn 6183 ISO GRIPS/06-UP GL 1800 with OEM HEATED GRIPS User Manual

Page 3

Advertising
background image

PAGE

3

Left Side Procedure

STEP 13

Repeat STEP 4 through STEP 8 using the left side covers instead of right.


STEP 14

Insert the M6-1 x 40mm Phillips Pan Head Screw (PPHS) in the end of the

grips, leaving loose for now, PIC 9


STEP 15

Insert the two #4-40 x 3/8” SHCS screws from the front side, ensure that

the grip heater wire is not pinched and fully tighten the fasteners, PIC 10

Secure all wiring away from any moving parts, pinch points or
extreme heat. Küryakyn WILL NOT issue a warranty on any
electrical component that fails due to pinched, crimped, broken,

abraded, melted or frayed wires.


STEP 16

Tighten the M6-1 x 40mm PPHS screw from STEP 14.


STEP 17

Position the end cap so that the four holes in the end cap align with the

holes in the covers and secure with the four #4-40 x 3/8” SHCS screws, fully

tightening them. PIC 8


STEP 18

Ensure that all the fasteners

have been tightened and that

the ISO grips do not interfere

with the functions of the

controls

before

riding

the

motorcycle.


It is the installer’s
responsibility to
ensure that all of the

fasteners (including

pre-assembled) are

tightened before

operation of the

motorcycle. Küryakyn

will not provide

warranty coverage

on products or

components lost

due to improper

installation or lack

of maintenance.

Periodic inspection

and maintenance

are required on all

fasteners.

Ride On!

ISO GRIPS

INSTALLATION

PIC 6

PIC 9

PIC 7

PIC 8

PIC 10

TABS NEED TO BE ENGAGED
GRIP OFF BIKE FOR CLARITY

PULL BACK ON
RUBBER TABS

CABLE TIES AROUND RIBS IF NEEDED

END CAP AND
SCREWS

SCREW LOCATION
TOWARDS FRONT OF

BIKE

SCREW LOCATION
TOWARDS FRONT OF

BIKE

Advertising