Rigid shear shank and shovel installation – Landoll 2131 Wing Coulter Chisel User Manual

Page 52

Advertising
background image

3-16

F-721-0513 Edition

ASSEMBLY INSTRUCTIONS

Rigid Shear Shank and Shovel
Installation

1.

Attach each shank assembly to each clamp
assembly using 3/4-10 x 4 hex head cap screws and
hex lock nuts in the top hole and 5/8-11 x 5-1/2 hex
head cap screw and hex lock nut in the lower hole
(See Figure 3-9.)

IMPORTANT

5/8 x 3/4 x 1-1/4 connex bushings shown in the
drawing are installed at the landoll corporation.

2.

Install 2 x 1 x 18 spikes or 1/2 x 4 x 26 twisted
shovels onto shanks as follows:

a.

Connect 2 x 1 x 18 spike to each shank using
1/2-13 x 3 hex head cap screws, flat washer (in
bottom hole only), split lock washers, and hex
nuts (See Figure 3-9.)

b.

Connect 1/2 x 4 x 26 twisted shovels to each
shank using 1/2-13 x 3 plow bolts, flat washer (in
bottom hole only), split lock washers, and hex
nuts. See Figures 2-1 thru 2-16 for
recommended locations of right hand and left
hand shovels.

IMPORTANT

Right and left twisted shovels are determined by
direction of dirt flow when facing the direction of
travel.

Advertising