Mounting steps, Mp 1000(s) dvi / mp 1050(s) dvi, Mechanical installation – Lenze MP 9000 DVI Operating Instructions User Manual

Page 26

Advertising
background image

Mechanical installation

Mounting steps
MP 1000(s) DVI / MP 1050(s) DVI

5

l

26

BA_MP9000DVI DE 4.0

5.3

Mounting steps

5.3.1

MP 1000(s) DVI / MP 1050(s) DVI

How to perform the installation:

1. Cut the mounting cutout into the control board (

25).

2. Check that the gasket under the front panel is located correctly.

3. Place the device in the mounting cutout and secure it against falling−down with one

hand.

4. Fit all screw clamp fixings as explained below:



‚

ƒ

ELx7xx−011

– Insert the screw clamp fixing into the slot in the housing of the device (see above

figure).

– Press the screw clamp fixing downwards, tilt it towards the housing and check

that it has firmly snapped into place.

– Tighten the screw clamp fixing hand−tight with a screwdriver.

5. Check that the device is securely located in the mounting cutout and that the front

panel gasket is located correctly.
– If necessary, realign the device/gasket.
– If the gasket is not located correctly, protection class IP65 is not achieved on the

front of the device!

Advertising
This manual is related to the following products: