MTS FGW900 High-temperature Furnace User Manual

Page 19

Advertising
background image

High temperature furnace body installation

FGW900 High-temperature Furnace Product Manual

Installation

19

5.2 According to the following figure shows, assemble the contact block whole

piece and limit switch whole piece to the furnace bottom front position.

5.3 Use 2 Metric M4X10 socket head cap screws to lock the contact assembly

piece, and then move the door switch assembly piece to make the door
switch closed, after that, mover forward another 0.5mm to lock the four
screws in the door switch assembly piece.

Furnace Bottom

Door Switch Assembly

Touch Assembly

c. Lock the door
switch assembly
four screw.

a. First ,lock touch
assembly.

b. Moving door switch
assembly so that the door
switch is closed, then moving
forward with 0.5mm.

Advertising