MTS Criterion 60 - Manual User Manual

Page 51

Advertising
background image

Moving Frames and Integrated Operations Platform

MTS Criterion™ Series 60 Product Manual

Installation

51

3. Put the frame base on a mat and let the frame lay horizontally, remove the

lifting rings on base.

Note

When the frame rises, keep a safe distance from the frame to avoid
personal injury.

4. Use a crane to slowly raise the frame to its upright position. As the frame

rises, keep moving the crane to keep the slings as straight as possible. As
there will be shake when the frame raise, please put the side board
(Unpacked from the frame package) under the frame to avoid frame
damages.

Advertising