DS-SERIES DUOSCREED — PARTS & OPERATION MANUAL — REV. #1 (03/06/01) — PAGE 19

DS-SERIES DUOSCREED — APPLICATION/OPERATION

Figure 16. DuoScreed Wet Screeding Application

APPROX.

8-9 FT.

HORIZONTAL

DIRECTION

HORIZONTAL

DIRECTION

BLADE OVERLAP

12-18 INCHES

DUOSCREED

B

LADE

DUOSCREED

BLADE

HORIZONTAL

DIRECTION

HORIZONTAL

DIRECTION

12-18 INCH

BASE

TOP RIGHT

CORNER OF

GRID

BLADE OVERLAP

12-18 INCHES

DUOSCREED

B

LADE

DUOSCREED

BLADE

HORIZONTAL

DIRECTION

HORIZONTAL

DIRECTION

HORIZONTAL

DIRECTION

HORIZONTAL

DIRECTION

12-18 INCH

BASE

TOP LEFT

CORNER OF

GRID

STARTING IN THE TOP LEFT CORNER OF GRID,
BUILD 18 INCH WIDE PARALLEL CONCRETE BASES
ACROSS GRADE PINS FROM TOP TO BOTTOM OF GRID.

STEP 4

STARTING IN THE TOP RIGHT CORNER OF GRID,
BUILD 18 INCH WIDE PARALLEL CONCRETE BASES
ACROSS GRADE PINS FROM TOP TO BOTTOM OF GRID.

STEP 6

STEP 1

PLACE # 5 REBAR GRADE PINS
AND FORM RECTANGULAR GRID.

RECTANGULAR

GRID

MAKE 12-18 INCH

BASE (LEFT SIDE)

STEP 3

SET SCREED BLADE DOWN ON

UNFINISHED 8 TO 9 FT. WIDE

MIDDLE SECTION, PLACING
BOTH ENDS OF THE BLADE

ON THE 12-18 INCH BASES.

STEP 7

DUOSCREED BLADE

STEP 5

STEP 7

STEP 7

VERTICAL

DIRECTION

POUR CONCRETE

AND FORM TO GRADE

STEP 2

MAKE 12-18 INCH

BASE (RIGHT SIDE)