MacDon Transport 25 ft 972 User Manual

Page 4

Advertising
background image

SET-UP INSTRUCTIONS

Form # 131126

Issue 11/07

2


LEFT END (FORWARD) WHEEL

1. On bottom flange of left endsheet, drill

two 0.656” holes* (B) as shown.
NOTE: Holes in bottom flange may be
round or square.

* These holes will be present on headers

built in Model Year 2001 and later.


2. Attach left wheel assembly at the two

holes drilled in step 1, using 5/8 x 1-1/4
carriage bolts at (H) (heads down) and
5/8 flange nuts.

3. Mark the position for hole (A) on the

endsheet, using the wheel assembly as
a guide. Drill a 0.656” diameter hole*.

* This hole will be present on headers

built in Model Year 2001 and later.

4. Position brace tube so that hole (C) is

484 mm (19.05”) from left endsheet as
shown. Mark this position and tack weld
a 5/8 x 1 inch black bolt from kit to main
tube. Position brace onto bolt and
confirm proper bolt position, then
remove brace from bolt and place a 5
mm (3/16”) weld completely around bolt
head.
NOTE: Ends of brace will bend slightly when initially tightened.

26 mm = 1.02”
170 mm = 6.69”
193 mm = 7.60”

LEFT ENDSHEET HOLES

LEFT ENDSHEET HOLE & WELDED BOLT

Advertising
This manual is related to the following products: