Instruction

Sheet

www

.prescolite.com

Prescolite T

ollFree T

echnical Suppor

t

1.888.PRS.4TEC

Hours: 8am - 5pm ET

701 Millennium Blvd, Greenville, SC 29607

With representatives offices in principal cities throughout North America.

Copyright 2012, 3/6/12, All Rights Reserved - Printed in U.S.A.

Part No ....................................................... 93040114

Sheet 1 of 1

IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information and instructions

concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials, and proper lamping. Do

not install in areas subject to combustible vapors or gases. Before wiring to power supply and during servicing or relamping, turn

off power at fuse or circuit breaker. All servicing or relamping must be performed by qualified service personnel.

Product must be grounded to avoid potential electric shock or other potential hazard. Product must be

mounted in locations and at heights and in a manner consistent with its intended use, and in compliance

with the National Electrical Code and local building codes. The use of accessory equipment not recommended by the

manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from product in

whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or the like to come into

contact with the product or to block light from the product, as this may cause an unsafe condition.

WARNING - This product contains chemicals known to the State of California to cause cancer, birth defects and/or other

reproductive harm. Thoroughly wash hands after installing, handling, cleaning, or otherwise touching this product.

CAUTION: TO REDUCE THE RISK OF ELECTRICAL SHOCK, MAKE CERTAIN THAT

THE POWER SUPPLY IS OFF BEFORE INSTALLING OR SERVICING THIS FIXTURE!

1. Install the fixture in the ceiling using the hanger bars (supplied), or mounting channel or bars

(by others) placed in the adjustable mounting brackets. Mount the fixture in the ceiling so that

the weight of the fixture is supported by the hanger bars, mounting channel, bar, and/or hanger

wires secured to the building structure. NOTE: Make sure the Battery Backup Unit and bracket

are mounted as shown in FIG. 1, and the mounting tab is securely held between the plaster

frame and the hanger bar mounting bracket.

2. Adjust the fixture so the bottom of the plaster flange opening is flush with the finished ceiling

line and in alignment with adjacent fixtures. Secure the mounting brackets by tightening wing

nuts on either side of the fixture.

3. Determine where the supply wiring conduit will enter the J-Box and

attach it in conformance with the National Electric Code and local codes.

4. Remove the J-Box cover plate. Remove the appropriate knockout and assemble the

appropriate connector for the supply wire used. Connect the ground wires to the green ground

leads. Connect the white (common) to the white (leads). Connect the power supply (line) to the

appropriate leads as per the Battery Backup Installation Instructions included with the fixture.

Reinstall the J-Box cover. WARNING: DO NOT pinch wires between the J-Box/ballast

cover and the J-Box. Consult a qualified electrician for all other options

that require other wiring configurations.

5. Pull the test switch assembly (1) down through opening in the fixture.

This assembly comes pre-adjusted for 6LFSQLED7 EM heat sinks (3” tall).

If this is to be installed on a 6LFSQLED5 EM heat sink (2” tall), loosen the

two adjustment screws (2), slide the switch bracket to the top of

the slots and retighten the screws. (SEE FIG. 1)

6. Insert the test switch assembly into the large fin slot (3) in the heat sink,

aligning the switch button with the hole in the reflector (4). (SEE FIG. 1)

7. Tighten the two screws (5) at the top of the assembly until it is flush with the top of the heat

sink and make sure the test button is centered and protrudes through the hole into the

reflector. Press the switch button to assure it does not bind and is functioning properly. (SEE

FIG. 1)

8. Pull the electrical cover (6) down through the opening in fixture. (SEE FIG. 1)

9. Compress each of the two torsion springs (7) and insert the spring ends into the two

brackets (8) on the plaster frame. (SEE FIG. 1)

10. Insert connector (9) into module (10) and snap electrical cover (6) onto module assembly.

(SEE FIG. 1)

11. Push trim assembly up towards ceiling until springs draw trim firmly against ceiling.

CAUTION: DO NOT ATTEMPT TO MODIFY OR REWIRE FACTORY INSTALLED

WIRING ON THE FIXTURE. SAFETY AND PROPER OPERATION OF THE FIXTURE

DEPEND ON THE INTEGRITY OF THE WIRING.

THE PRODUCT MUST BE INSTALLED BY A PERSON FAMILIAR WITH THE

CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS

INVOLVED, IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE.

KEEP THESE INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

LITEFRAME

®

LF6SQLED EM & 6SQLED EM

FIG.1