Prescolite EM Vertical User Manual

Instruc tion sheet, Em vertical, Installation instructions

Advertising
background image

Instruc

tion
Sheet

www

.prescolite.com

Prescolite T

oll Free T

echnical Suppor

t 1.888.PRS.4TEC

Hours: 8am-5pm ET

Part Number 93015342

701 Millennium Blvd, Greenville, SC 29607

With representatives offices in principal cities throughout North America.

Copyright 2008, 02/06/08, All Rights Reserved - Printed in U.S.A.

1

IMPORTANT SAFETY INFORMATION. READ AND FOLLOW SAFETY INSTRUCTIONS. Follow label information
and instructions concerning wet or damp locations, installation near combustible materials, insulation, building materials,
and proper lamping. Do not install in areas subject to combustible vapors or gases. Before wiring to power supply and during
servicing or relamping, turn off power at fuse or circuit breaker. All servicing or relamping must be performed by
qualified service personnel. Product must be grounded to avoid potential electric shock or other potenial
hazard. Product must be mounted in locations and at heights in a manner consistent with its intended
use, an in compliance with the National Electrical Code and local codes.
The use of accessory equipment not
recommended by the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not black light
emanating from product in whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains,
screens, or the like to come into contact with the product or to block light from the product, as this may cause an unsafe condition.

1. Install reflector after all ceiling installation and finishing

work is complete. Insert sides of heatsink spring into
reflector neck clearance slots, then twist heatsink and push
down until desired position on the reflector is obtained.
Align heatsink spring with appropriate reflector slots.
Heatsink will lock into place, but may be readjusted by
twisting and sliding the heatsink into another position.
Do NOT use the reflector neck clearance slots as a final
installation position for the heatsink.

2. Push reflector into the plaster flange until the reflector is

flush against the ceiling.

3. Install the proper lamps (by others).

INSTALLATION INSTRUCTIONS

EM VERTICAL

CAUTION: DO NOT ATTEMPT TO MODIFY OR REWIRE FACTORY-
INSTALLED WIRING ON THE FIXTURE. SAFETY AND PROPER
OPERATION OF THE FIXTURE DEPEND ON THE INTEGRITY OF THE
WIRING.

SAVE THESE INSTRUCTIONS.

MAINTENANCE

Although no routine maintenance is required to keep emergency ballast
functional, it should be checked periodically to ensure that it is working. The
following schedule is recommended:

1. Visually inspect the charging indicator light monthly. It should be illuminated.
2. Test the emergency operation of the fixture at 30-day intervals for a

minimum of 30 seconds. One or two lamps should operate at reduced
illumination.

3. Conduct a 90-minute discharge test once a year. One or two lamps should

operate at reduced illumination for at least 90 minutes.

REFER ANY SERVICING INDICATED BY THESE CHECKS TO
QUALIFIED PERSONNEL!

Reflector

Heatsink

Plaster Frame

J-box

Adjustable

Mounting

Bracket

ITS Switch

Wireway

Thru Box

Push This

Button To Test

Advertising