Prescolite 79M_EB SERIES HOUSINGS User Manual

Instruction sheet, Installation instructions 79m_eb series housings

Advertising
background image

Instruction

Sheet

www

.prescolite.com

Prescolite T

ollFree T

echnical Suppor

t

1.888.PRS.4TEC

Hours: 8am - 5pm ET

701 Millennium Blvd, Greenville, SC 29607

With representatives offices in principal cities throughout North America.

Copyright 2008, 11/18/08, All Rights Reserved - Printed in U.S.A.

Part No ....................................................... 93020673

Sheet 1 of 2

IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information and instructions

concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials, and proper lamping. Do

not install in areas subject to combustible vapors or gases. Before wiring to power supply and during servicing or relamping, turn

off power at fuse or circuit breaker. All servicing or relamping must be performed by qualified service personnel.

Product must be grounded to avoid potential electric shock or other potential hazard. Product must be

mounted in locations and at heights and in a manner consistent with its intended use, and in compliance

with the National Electrical Code and local building codes. The use of accessory equipment not recommended by the

manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from product in

whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or the like to come into

contact with the product or to block light from the product, as this may cause an unsafe condition.

9-1/2"

24"

10-13/16"

16-3/4"

5-5/8"

(Baffle)

6-7/8"

(Trim Ring)

Ballast

Plaster Flange

Adjustable

Mounting

Bracket (2)

Wing Nut

J-Box

J-Box Cover (2)

Adjustable Socket Bracket

CAUTION: TO REDUCE THE RISK OF ELECTRICAL SHOCK, MAKE CERTAIN THAT THE
POWER IS OFF BEFORE INSTALLING OR SERVICING THIS FIXTURE.

1. Install the fixture in the ceiling using B24 or B6 bar hangers, or mounting channel or bar (by others), placed in the adjustable

mounting brackets. Mount the fixture in the ceiling so that the weight of the fixture is supported by the mounting channel or bar

and/or hanger wires secured to the building structure.

2. Adjust the fixture so the bottom of the plaster flange is flush with the finished ceiling, and is in alignment with adjacent fixtures.

3. Determine where the supply wiring conduit will enter the J-Box, and attach it in conformance with the National Electric Code.

4. Remove the J-Box Cover plates, connect the power supply leads, black to black (line), and white to white (common). Connect the

ground wire to the green ground wire in the J-Box. Re-install the J-Box cover plates.

INSTALLATION INSTRUCTIONS

79M_EB SERIES HOUSINGS

WARNING- This product contains chemicals known to the State of California to cause cancer, birth defects, and /or
other reproductive harm. Thoroughly wash hands after installing, handling, cleaning, or otherwise touching this product.

Advertising