Salsbury Industries S-30000 Series See-Through Designer Lockers User Manual

Installation instructions, Salsbury industries, Hardware supplied with each locker

Advertising
background image

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Phone: 1-800-562-

5377 Int’l Phone: 323-846-6700

Fax: 1-800-562-

5399 Int’l Fax: 323-846-6800

www.lockers.com engineering

@

lockers.com

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2013 Salsbury Industries. All rights reserved. 5/1/2013 Page 1 of 2

t

See-Through Designer Lockers

– S-30000 Series

Installation Instructions

Thank you for selecting the S-30000 Series See-Through Designer Lockers. We are confident that the quality and construction of the lockers will

prove to be a good investment. These instructions are intended to assist you in a typical wall-anchored or back-to-back locker installation. Individual
job conditions will dictate the type of fasteners and whether the lockers must be anchored to the wall, the floor, or both.

The S-30000 Series See-Through Designer Lockers require minimal
assembly. The basic lockers are factory assembled. It may be

necessary to install the bases onto the floor, the lockers onto the bases
and to each other, the optional side panels to the exposed sides of the
lockers, and the lockers to a wall. See reverse side for illustration of

three lockers being installed.

Hardware Supplied with Each Locker

1. (1) Metal wall strap with three holes to attach locker to wall or back-to-
back. Bend the strap to tie locker to wall as shown in illustration.

2. (3) #10 x 5/8” long hex-head sheet metal screws to attach strap to top

of lockers back-to-back or between locker and wall.

3. (2) #10 x 1-3/8” long hex-head machine screws to fasten lockers
together side-by-side. Mating t-nuts are pre-installed in locker walls.
See reverse side for illustration of three lockers being installed.

4. (2) 1-1/4” long drywall screws to attach side panel to locker.

5. (1) Number plate.

Installation Instructions

1. Bases should be set in place and leveled. The rear edge of the base
should touch the wall or the other base if lockers are installed back-to-
back. There are 1-wide and 3-wide bases.

2. If the back of the locker is against a wall, bend the metal strap as
shown in the illustration. Set the locker on the base spaced 5/8” from the

wall for ventilation air. The metal straps will be installed in Step 5 below.

Leave the metal strap flat for fastening lockers back-to-back. Allow a 1-

1/4” ventilation space between the backs of lockers if lockers are back-to-
back and side panels are being installed. The metal straps will be

installed in Step 5 below.

3. Bolt multiple lockers together through the two unused holes and tee

nuts near the door hinges.

4. Attach the finished side panels flush with the front of the locker body
(not the door) allowing the excess to cover the 5/8” rear air space.

5. Once the lockers are plumb and level, attach the bent or flat metal
straps to the top of the lockers and to the wall or other lockers as

required.

6. Peel backing from number plate, align, and press into recess.

Illustration – 1 Locker

Advertising